Limestone Processing Project of Mobile Crushing Line in Crimea, Russia
The opportunity for this cooperation was made possible by the construction of a government-backed bridge across the Kerch Strait in Crimea. Five years earlier, the same government-led uranium backfill project was put on hold due to the turbulent situation and economic conditions at that time. During the five years, the contact between Liming Heavy Industries and the customer never stopped, and when the customer took over the project immediately locked in Liming Heavy Industries.
Processing material: limestone
Production capacity: 250T/H
Feeding size: ≤700mm
Discharge size: 0-5mm, 5-10mm, 10-20mm
Limestone Processing Project of Mobile Crushing Line in Crimea, Russia
Site situation:
The whole project is operated by the intelligent control system, the material is crushed below 180mm by the loader into the KE860-1 coarse crushing mobile station, the crushed material is conveyed to two 4000×4000 transit silos by the belt conveyor, then conveyed to two KH300-2 medium and fine crushing and screening mobile stations for secondary crushing below 50mm by the vibrating feeder and belt conveyor below the silos, the crushed material is sent to the vibrating screen for secondary crushing below 50mm by two belt conveyors. After crushing, the material is sent to the vibrating screen by two belts for sieving, and three kinds of materials are sieved out: 0-5mm, 5-25mm and 25-50mm, 0-5mm material is sent to the pile by two belts, 5-25mm material is sent to the KV9532-2 fine crushing and screening mobile station for shaping and screening, 25-50mm material is sent to the HPT300 multi-cylinder hydraulic cone crusher for another crushing. crusher again until it reaches below 25mm.
Customer Comments:
This project has shown us the powerful crushing capacity and rich configuration options of Liming K series tire mobile plant. This cooperation not only won our trust because of the excellent performance of Liming equipment, but also because of the unremitting efforts and sincere heart of Liming engineers, because with them, our future cooperation will have more possibilities!