Home > case > Grinding production line process > Limestone ore powder > General contract for limestone powder production project in Inner Mongolia Alashan League

General contract for limestone powder production project in Inner Mongolia Alashan League

A company in Inner Mongolia is a large private enterprise with a circular economy industry chain of coal, urban central heating and cement building materials. The project adopts the EPC project turnkey model: from the preliminary raw material testing to the later installation and commissioning, acceptance and commissioning, Liming provides the whole guidance and production testing of the main and auxiliary equipment, and has a professional technical service team for the later maintenance of the system.

Processing material: limestone

Production capacity: 15-20T/H

Feed size: 150mm

Fineness of finished product: 250 mesh

General contract for limestone powder production project in Inner Mongolia Alashan League

General contract for limestone powder production project in Inner Mongolia Alashan League

 

Site conditions:

After the bulk material is crushed to the required size of 30mm by the jaw crusher, it is sent to the storage hopper by the elevator, and then the material is sent to the main grinding chamber of the MTW175Z Euro Mill by the belt conveyor in a uniform and quantitative manner for grinding. Under the action of the impeller of the separator, the materials that do not meet the fineness requirements fall into the grinding chamber for regrinding, while the qualified materials enter the cyclone powder collector through the air inclined chute for separation and collection, and are discharged through the discharge device as the finished powder. The whole process is a closed circuit system and operates under positive and negative pressure, equipped with a pulse dust collector, making the production site clean and tidy.

Customer comments:

At the time of the performance acceptance of the entire production line, the crushing system had a capacity of 60 tonnes per hour and the grinding system had a capacity of 15 tonnes per hour, with all indicators meeting our initial technical agreement. We are very satisfied with the simple and reasonable design of the project, the consistent and tight process, the compact layout of the equipment, the environmental protection and low-carbon production, and the stable and energy-saving operation.